– I-5 Bridge Closure for Maintenance. (Feb 9-11)

USCG has approved a temporary deviation to the opening schedule of the I-5 bridge. The bridge will not open for river traffic 0600 February 9 to 0600 February 11. This is for continuing maintenance of the bridge electrical system.